How Landscape Curbing Is Installed, Step by Step
Knowing what happens on pour day makes the whole project easier. Here is the usual order of work for poured landscape curbing.

Layout
We spray the border on your lawn with marking paint and adjust it with you. This is when to change curves, add beds or move the line away from trees.
Trench and base
The sod is cut and the trench is dug and compacted. Utilities and irrigation lines are located first. Sleeves can be set for future wires or pipes.
The pour
A curbing machine takes concrete from a mixer or truck and extrudes it along the line in the shape you chose. Hand tools finish curves, ends and joins.
Texture, color and joints
While the concrete is fresh, color is applied, the stamp pattern is pressed and joints are cut or tooled so the curb can move without cracking.
Cure and seal
The curb cures for days, and a sealer goes on once it is ready. We tell you how long to keep off it and when you can mow.
Mistakes to avoid
- Skipping the layout step
- Pouring in heavy rain or a hard freeze
- Mowing or walking on the curb too soon
- Not marking irrigation first
How Curbing Is Installed: questions
How long does the pour take?
Most yards take a day or two, then the concrete cures.
Can I be home during the pour?
Yes, and many people like to watch. Keep pets and children away from the crew and the wet concrete.