Landscape Curbing Day Planner

Enter the length of border, the finish and the number of crews to see how many pour days to expect, when you can walk on it and when to plan sealing.

Landscape Curbing Day Planner
CalculatorLIVE MATH
Finish
Pour days0
First light walk-on day0
Plan sealing around day0

How the curbing day planner works

Each crew pours about 300 feet a day of plain finish, 160 feet of stamped and 120 feet of colored and stamped. Pour days are the footage divided by the pace times the crews, rounded up.

The first light walk-on day is the day after the last pour day. Sealing is planned 28 days after the last pour, which is a planning figure. Always follow the advice for the products used.

Weather can change the schedule, and rain or a hard freeze can delay a pour.

Questions

Curbing Day Planner: questions

Why is stamped slower?

Pressing the pattern and adding color takes time and care.

Can I mow right away?

No. Wait until we say the curb has cured.

Free estimate

Want these numbers checked by a person?

Send the form or call. We will go through them with you.

Free estimate

Tell us about your yard

Tell us which beds, trees, walks or drives you want to border and what you picture: stamped stone, brick, smooth or colored. A real person will reply with a clear next step and a visit time.

Prefer to talk? Call(800) 224-9245
  • Free estimates with a clear written plan
  • Concrete curbing, edging, repair, sealing and care
  • We paint the line on your lawn before we pour

Get a free estimate

We only use your details to answer your message and prepare your estimate.